Ongoing
Urban Road
Works
Construction Of 1.5Km Sagnarigu Market Roads With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walkways, 0.9M Side Drains, Bicycle Lane, Plant 200No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings
Sagnarigu Municipal Assembly
Physical Completion
41%Map Location
Other Sub-Projects in Sagnarigu
Complete The Construction Of Commercial Building Sheds(6No.) And External Works At Sagnarigu Market
Completed
Construct 1.26Km Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walk- Ways, 0.9M Side Drains, Bicycle Lane, Plant 600No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings (Gumani-Nyanshegu)
Ongoing
Construction Of 0.9Km Road With Drains, Road Marking, Streetlights At Katariga Off The Tamale-Kumbungu Road
Completed
Construction Of 1,600M Rectangular Drain, 1No. Box Culvvert And 7No. Footbridges Along Nobisco - Naaluro Stream (Phase Ii)
Practically Completed
Construction Of 1.2Km Gundaa Naa Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walkways, 0.9M Side Drains, Bicycle Lane, Plant 200No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings
Ongoing
Construction Of 1.65Km Bitumenous Katariga Road With The Following Facilities, Paved Pedestrian Walkway, 0.9M Side Drains, Bicycle Lane, Plant 200 No. Acacia Trees And Installation Of 60No. Metallic Single Arm Led Streetlights With Road Markings At Katariga-Shugashee Road
Ongoing
View all sub-projects in Sagnarigu
Sub-Project Details
Investment Type
Urban Road
Category
Works
Municipal Assembly