Municipal Assembly

Sagnarigu

18

Sub-Projects

10

Completed

8

Ongoing

89%

Avg. Completion

Completed 100%

Complete The Construction Of Commercial Building Sheds(6No.) And External Works At Sagnarigu Market

Urban Market Works
View details
Ongoing 88%

Construct 1.26Km Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walk- Ways, 0.9M Side Drains, Bicycle Lane, Plant 600No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings (Gumani-Nyanshegu)

Urban Road Works
View details
Completed 100%

Construction Of 0.9Km Road With Drains, Road Marking, Streetlights At Katariga Off The Tamale-Kumbungu Road

Urban Road Works
View details
Practically Completed 99%

Construction Of 1,600M Rectangular Drain, 1No. Box Culvvert And 7No. Footbridges Along Nobisco - Naaluro Stream (Phase Ii)

Storm Water Drainage Works
View details
Ongoing 38%

Construction Of 1.2Km Gundaa Naa Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walkways, 0.9M Side Drains, Bicycle Lane, Plant 200No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings

Urban Road Works
View details
Ongoing 41%

Construction Of 1.5Km Sagnarigu Market Roads With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walkways, 0.9M Side Drains, Bicycle Lane, Plant 200No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings

Urban Road Works
View details
Ongoing 85%

Construction Of 1.65Km Bitumenous Katariga Road With The Following Facilities, Paved Pedestrian Walkway, 0.9M Side Drains, Bicycle Lane, Plant 200 No. Acacia Trees And Installation Of 60No. Metallic Single Arm Led Streetlights With Road Markings At Katariga-Shugashee Road

Urban Road Works
View details
Ongoing 88%

Construction Of 2-Storey 20No. Lockable Stores At With A Bank, 24No. Stalls And Paving Of 977.5Sqm Car Park At Katariga Market

Urban Market Works
View details
Completed 100%

Construction Of 2-Storey 22No. Lockable Stores, Police Post, Creche, Clinic, 72No. Stalls, Buthcery, Rehabilitation Of Washrooms At Jisonaayili

Urban Market Works
View details
Completed 100%

Construction Of 2-Storey 40No. Lockable Stores At Kalpohin Market

Urban Market Works
View details
Completed 100%

Construction Of 2-Storey 40No. Lockable Stores, 2-Storey , 24No. Lockable Stores, 2-Storey Banking Facility And External Works (Paving Of Lorry Parks) At Jisonayili

Urban Market Works
View details
Ongoing 74%

Construction Of 2-Storey Commercial Building With The Following Facilities Stores, Six (6)No. Wash Rooms And Warehouse At Katariga Market

Urban Market Works
View details
Completed 100%

Construction Of 2.025Km Kpalsi – Dimala Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walk-Ways, 0.9M Side Drains, Bicycle Lane, Plant 600 No. Metallic Single Arm Led Streetlights With Road Signs And Markings

Urban Road Works
View details
Completed 100%

Construction Of 24No. Stalls, 14 Seater Washroom Facility And External Works (Paving Of Lorry Park) At Kalpohin Market

Urban Market Works
View details
Completed 100%

Construction Of 4.0 X 2.0M (0.3Km) And 2.5M X 1.5M (0.5Km) Storm Drains At Ward K, Sagnerigu

Storm Water Drainage Works
View details
Ongoing 81%

Construction Of Clinic, Creche And Stores At Sagnarigu Market

Urban Market Works
View details
Completed 100%

Construction Of Phase II Of Sagnarigu Market With 24No. Lockable Stores, Washroom Facility, And Paving 1291 sqm Lorry Park

Urban Market Works
View details
Completed 100%

Construction Of Road (0.7Km) With 1.5Km Roadside Drains, 1No Box Culvert, 1.2Km Pedestrian Walkway And Installation Of 19No Street Lighting Facilities At Ward K, Sagnarigu

Urban Road Works
View details