Municipal Assembly
Sagnarigu
18
Sub-Projects
10
Completed
8
Ongoing
89%
Avg. Completion
Completed
100%
Complete The Construction Of Commercial Building Sheds(6No.) And External Works At Sagnarigu Market
Urban Market
Works
View details
Ongoing
88%
Construct 1.26Km Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walk- Ways, 0.9M Side Drains, Bicycle Lane, Plant 600No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings (Gumani-Nyanshegu)
Urban Road
Works
View details
Completed
100%
Construction Of 0.9Km Road With Drains, Road Marking, Streetlights At Katariga Off The Tamale-Kumbungu Road
Urban Road
Works
View details
Practically Completed
99%
Construction Of 1,600M Rectangular Drain, 1No. Box Culvvert And 7No. Footbridges Along Nobisco - Naaluro Stream (Phase Ii)
Storm Water Drainage
Works
View details
Ongoing
38%
Construction Of 1.2Km Gundaa Naa Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walkways, 0.9M Side Drains, Bicycle Lane, Plant 200No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings
Urban Road
Works
View details
Ongoing
41%
Construction Of 1.5Km Sagnarigu Market Roads With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walkways, 0.9M Side Drains, Bicycle Lane, Plant 200No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings
Urban Road
Works
View details
Ongoing
85%
Construction Of 1.65Km Bitumenous Katariga Road With The Following Facilities, Paved Pedestrian Walkway, 0.9M Side Drains, Bicycle Lane, Plant 200 No. Acacia Trees And Installation Of 60No. Metallic Single Arm Led Streetlights With Road Markings At Katariga-Shugashee Road
Urban Road
Works
View details
Ongoing
88%
Construction Of 2-Storey 20No. Lockable Stores At With A Bank, 24No. Stalls And Paving Of 977.5Sqm Car Park At Katariga Market
Urban Market
Works
View details
Completed
100%
Construction Of 2-Storey 22No. Lockable Stores, Police Post, Creche, Clinic, 72No. Stalls, Buthcery, Rehabilitation Of Washrooms At Jisonaayili
Urban Market
Works
View details
Completed
100%
Construction Of 2-Storey 40No. Lockable Stores At Kalpohin Market
Urban Market
Works
View details
Completed
100%
Construction Of 2-Storey 40No. Lockable Stores, 2-Storey , 24No. Lockable Stores, 2-Storey Banking Facility And External Works (Paving Of Lorry Parks) At Jisonayili
Urban Market
Works
View details
Ongoing
74%
Construction Of 2-Storey Commercial Building With The Following Facilities Stores, Six (6)No. Wash Rooms And Warehouse At Katariga Market
Urban Market
Works
View details
Completed
100%
Construction Of 2.025Km Kpalsi – Dimala Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walk-Ways, 0.9M Side Drains, Bicycle Lane, Plant 600 No. Metallic Single Arm Led Streetlights With Road Signs And Markings
Urban Road
Works
View details
Completed
100%
Construction Of 24No. Stalls, 14 Seater Washroom Facility And External Works (Paving Of Lorry Park) At Kalpohin Market
Urban Market
Works
View details
Completed
100%
Construction Of 4.0 X 2.0M (0.3Km) And 2.5M X 1.5M (0.5Km) Storm Drains At Ward K, Sagnerigu
Storm Water Drainage
Works
View details
Ongoing
81%
Construction Of Clinic, Creche And Stores At Sagnarigu Market
Urban Market
Works
View details
Completed
100%
Construction Of Phase II Of Sagnarigu Market With 24No. Lockable Stores, Washroom Facility, And Paving 1291 sqm Lorry Park
Urban Market
Works
View details
Completed
100%
Construction Of Road (0.7Km) With 1.5Km Roadside Drains, 1No Box Culvert, 1.2Km Pedestrian Walkway And Installation Of 19No Street Lighting Facilities At Ward K, Sagnarigu
Urban Road
Works
View details