Ongoing Urban Road Works

Construction Of 1.2Km Gundaa Naa Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walkways, 0.9M Side Drains, Bicycle Lane, Plant 200No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings

Sagnarigu Municipal Assembly