Ongoing Urban Road Works

Construct 1.26Km Road With The Following Facilities: Surfacing With Bitumen, Paved Pedestrian Walk- Ways, 0.9M Side Drains, Bicycle Lane, Plant 600No. Acacia Trees And 60No. Metallic Single Arm Led Streetlights With Road Signs And Markings (Gumani-Nyanshegu)

Sagnarigu Municipal Assembly