Practically Completed
Streetlights
Goods
Supply And Installation Of 60No Double Armed Streetlights (2.70Km) And 4No Traffic Signals
Sunyani Municipal Assembly
Physical Completion
99%Map Location
Other Sub-Projects in Sunyani
Construction Of 1.40Km Tarred Road With 1,400M 0.6M And 0.9M Slabbed U-Drains, 3X3M Double Cell Culvert, Paved 1,400M Walkways And 47No. Single Arm Street Lights, 47No. Luminaries
Practically Completed
Construction Of 1.40Km Tarred Road With 1.40Km 0.6M And 0.9M Slabbed U-Drains, 1400M Paved Walkways And 47No. Single Arm Streetlights
Ongoing
Construction Of 108 Unit Market Stalls, Creche, Police Post, Fire Post, Health Post, Fire Hydrant And Spreading Chippings With Mechanized Borehole At Nana Bosoma Market
Ongoing
Construction Of 120No. Lockable Stores, 1No. Banking Hall, Passenger Waiting Area, 2No. Tools Booths And Ticketing Room, 4No Refuse Containers, 1No. Mechanised Borehole, 1No. 20 W/C Toilets And 60 Single Arm Street Light With Luminaries, Warehouse And Pavement Of 10,233M2 At Nana Bosoma Market
Ongoing
Construction of 1km Tarred Road with 1000m 0.6m and 0.9m Slabbed U-Drains, Paved 1000m Walkways and 35No. Single-Arm Streetlights, 35No. Luminaries from Social Welfare School to Nana Bosoma Market, Sunyani
Completed
Construction Of 1No. Football Pitch (Grassing) With Chainlink Fencing, Basketball Court, Volley/ Tennis Court Area, Electrical Supply/Lighting System, Change Room And Sanitary Facilities At Abesim
Ongoing
View all sub-projects in Sunyani
Sub-Project Details
Investment Type
Streetlights
Category
Goods
Municipal Assembly
Sunyani