Municipal Assembly

Sunyani

14

Sub-Projects

5

Completed

9

Ongoing

84%

Avg. Completion

Practically Completed 99%

Construction Of 1.40Km Tarred Road With 1,400M 0.6M And 0.9M Slabbed U-Drains, 3X3M Double Cell Culvert, Paved 1,400M Walkways And 47No. Single Arm Street Lights, 47No. Luminaries

Urban Road Works
View details
Ongoing 57%

Construction Of 1.40Km Tarred Road With 1.40Km 0.6M And 0.9M Slabbed U-Drains, 1400M Paved Walkways And 47No. Single Arm Streetlights

Urban Road Works
View details
Ongoing 76%

Construction Of 108 Unit Market Stalls, Creche, Police Post, Fire Post, Health Post, Fire Hydrant And Spreading Chippings With Mechanized Borehole At Nana Bosoma Market

Urban Market Works
View details
Ongoing 75%

Construction Of 120No. Lockable Stores, 1No. Banking Hall, Passenger Waiting Area, 2No. Tools Booths And Ticketing Room, 4No Refuse Containers, 1No. Mechanised Borehole, 1No. 20 W/C Toilets And 60 Single Arm Street Light With Luminaries, Warehouse And Pavement Of 10,233M2 At Nana Bosoma Market

Urban Market Works
View details
Ongoing 82%

Construction Of 1No. Football Pitch (Grassing) With Chainlink Fencing, Basketball Court, Volley/ Tennis Court Area, Electrical Supply/Lighting System, Change Room And Sanitary Facilities At Abesim

Urban Park Works
View details
Ongoing 89%

Construction Of 96 Unit Lockable Stores At Nana Bosoma Market

Urban Market Works
View details
Completed 100%

Construction Of Reinforced Concrete Storm Drain (500X3X2.5)M, 400M Of 0.9M U-Drain And Levelling To Reclaim 3 Acre Old Dump Site At Abetifi Zongo

Storm Water Drainage Works
View details
Completed 100%

Construction of 1km Tarred Road with 1000m 0.6m and 0.9m Slabbed U-Drains, Paved 1000m Walkways and 35No. Single-Arm Streetlights, 35No. Luminaries from Social Welfare School to Nana Bosoma Market, Sunyani

Urban Road Works
View details
Ongoing 50%

Paving Of Daily Market From Masom Masom-Chiraa Station, 1,400 Sqm And Construction Of 3M X 3M Box Culvert At Abesim

Urban Market Works
View details
Practically Completed 99%

Supply And Installation Of 60No Double Armed Streetlights (2.70Km) And 4No Traffic Signals

Streetlights Goods
View details
Completed 100%

Supply Of 10No.12cum Refuse Skip Containers and 1000No. 240 Litre Refuse Containers

Waste Collection Goods
View details
Completed 100%

Supply Of 1No. 14M High Altitude Operation Truck

Streetlights Goods
View details
Completed 100%

Supply Of 1No. Refuse Skip Loader Truck And 1No. Refuse Compactor Truck

Waste Collection Goods
View details
Ongoing 45%

Supply, Installation And Commission Of Streetlight, 150No. Double Arms 300, 150W Led Lunimaries, Complete 16Mm Sq. & 25Mm Sq. Cables In Conduit With 4No Control Panel Cubicles

Streetlights Goods
View details