Ongoing Urban Road Works

Construction Of 1.40Km Tarred Road With 1.40Km 0.6M And 0.9M Slabbed U-Drains, 1400M Paved Walkways And 47No. Single Arm Streetlights

Sunyani Municipal Assembly