Completed
Urban Road
Works
Upgrading Of Gha-Articulator Station Link Road (2.4Km)
Bawku Municipal Assembly
Physical Completion
100%Map Location
Other Sub-Projects in Bawku
Construction Of 0.645Km Daduri Area Road With Bituminous Surfacing, One Carriageway (2 Lanes), Open U-Drains At The Sides, Streetlights, Road Signs And Markings
Ongoing
Construction Of 0.754Km Kariyama Road With Bituminous Surfacing, One Carriageway (2 Lanes), Open U-Drains At The Sides, Streetlights, Road Signs And Markings.
Ongoing
Construction Of 1.07Km Fire Service – Possum Area Road With Bituminous Surfacing, One Carriageway (2 Lanes), Open U-Drains At The Sides, Streetlights, Road Signs And Markings
Ongoing
Construction Of 1No 2-Storey 24-Unit Lockable Store With External Works
Ongoing
Construction Of 40No Lockable Stores And Banking Facility
Ongoing
Construction Of 44No Lockable Stores With External Works And Car Park
Ongoing
View all sub-projects in Bawku
Sub-Project Details
Investment Type
Urban Road
Category
Works
Municipal Assembly
Bawku