Ongoing Urban Road Works

Construction Of 0.754Km Kariyama Road With Bituminous Surfacing, One Carriageway (2 Lanes), Open U-Drains At The Sides, Streetlights, Road Signs And Markings.

Bawku Municipal Assembly