Municipal Assembly

Bawku

11

Sub-Projects

3

Completed

8

Ongoing

64%

Avg. Completion

Ongoing 5%

Construction Of 0.645Km Daduri Area Road With Bituminous Surfacing, One Carriageway (2 Lanes), Open U-Drains At The Sides, Streetlights, Road Signs And Markings

Urban Road Works
View details
Ongoing 70%

Construction Of 0.754Km Kariyama Road With Bituminous Surfacing, One Carriageway (2 Lanes), Open U-Drains At The Sides, Streetlights, Road Signs And Markings.

Urban Road Works
View details
Ongoing 36%

Construction Of 1.07Km Fire Service – Possum Area Road With Bituminous Surfacing, One Carriageway (2 Lanes), Open U-Drains At The Sides, Streetlights, Road Signs And Markings

Urban Road Works
View details
Ongoing 56%

Construction Of 1No 2-Storey 24-Unit Lockable Store With External Works

Urban Market Works
View details
Ongoing 40%

Construction Of 40No Lockable Stores And Banking Facility

Urban Market Works
View details
Ongoing 85%

Construction Of 44No Lockable Stores With External Works And Car Park

Urban Market Works
View details
Ongoing 48%

Construction Of A Modern Astroturf With An Office, A Changing Room, A Dais, A Washroom And Fence At Winamzua Cluster Of Schools

Urban Park Works
View details
Completed 100%

Paving Of Existing Market (20000Sqm)

Urban Market Works
View details
Completed 100%

Redevelopment Of Bawku Central Market Phase I: Demolition And Construction Of 1No. 2-Storey 48No. Lockable Stores At Bawku

Urban Market Works
View details
Completed 100%

Upgrading Of Gha-Articulator Station Link Road (2.4Km)

Urban Road Works
View details
Ongoing 68%

Upgrading Of Goil-Techiman Station Road (0.4Km) Non-Motorized Lane, 0.4M Open U-Drain With Street Lights, Road Signs And Markings

Urban Road Works
View details