Completed Urban Road Works

Construction Of Wa-Charia Road (6.02Km - Single Surface Dressing), Construction Of Road And Paving, Installation Of Streetlights (Kambali-Dobile Link Road), Construction Of 1No. 3.0M X 3.0M Box Culvert - 15M Long, 1No. 2 0.9 Dia Pipe Culvert - 8M Long

Wa Municipal Assembly