Municipal Assembly
Wa
8
Sub-Projects
8
Completed
0
Ongoing
100%
Avg. Completion
Completed
100%
Construction Of 0.225Km Reinforced Concrete Storm Drain (4.5M X 2.0M) And 0.250Km Reinforced Concrete Storm Drain (4.5M X 1.6M) And 3No. 3-Cell 3Mx3M Box Culvert At Wa
Storm Water Drainage
Works
View details
Completed
100%
Construction Of 1.2Km Road With Bitumen Surfacing From Kambali Central Mosque To Dobile Link Road
Urban Road
Works
View details
Completed
100%
Construction Of 2-Storey 19No Lockable Stores, 1No Town Hall With Restaurant And Washrooms At Fadama Market, Wa
Urban Market
Works
View details
Completed
100%
Construction Of 2-Storey 32No Lockable Stores, 1No Fire Post, 1No Police Post, Washrooms, Installation Of 10No Security Lighting Facilities And External Paving Works (1612 Sq.M) At Fadama Market, Wa
Urban Market
Works
View details
Completed
100%
Construction Of 2-Storey 46No Lockable Stores, 1No Health Post, 1No Creche And Washrooms At Fadama Market, Wa
Urban Market
Works
View details
Completed
100%
Construction Of Wa Jonga Roads (3.9Km)
Urban Road
Works
View details
Completed
100%
Construction Of Wa Jonga Roads (3.9Km)
Urban Road
Works
View details
Completed
100%
Construction Of Wa-Charia Road (6.02Km - Single Surface Dressing), Construction Of Road And Paving, Installation Of Streetlights (Kambali-Dobile Link Road), Construction Of 1No. 3.0M X 3.0M Box Culvert - 15M Long, 1No. 2 0.9 Dia Pipe Culvert - 8M Long
Urban Road
Works
View details