Completed Urban Road Works

Upgrading Of Ucew Distance Centre (Hansua) To Diasempa Road (2150M) Comprising 0.9M Diameter U-Drain (2850M), 0.6M Diameter U-Drain (1550M), 1.2M Diameter Pipe Culvert, Sub-Base (2150M), Base (2150M), Primer Seal (2150M) And Seal (2150M)

Techiman Municipal Assembly