Municipal Assembly

Techiman

16

Sub-Projects

11

Completed

5

Ongoing

93%

Avg. Completion

Practically Completed 99%

Construction Of Urban Park (Phase 1) Comprising Football Pitch, Titan Tracks And A Multi-Purpose Court And Construction Of 2No. Social Center With Two Offices And Snack Bars In Techiman Urban Area

Urban Park Works
View details
Ongoing 50%

Construction Of Urban Park (Phase II) Comprising Vip Stand And Changing Rooms At Techiman

Urban Park Works
View details
Completed 100%

Construction of 2-Storey Block of Shops (Block A) at Nana Abena Market in Techiman

Urban Market Works
View details
Completed 100%

Construction of Eateries and Shops (Block B) at Nana Abena Market in Techiman

Urban Market Works
View details
Completed 100%

Construction of Stalls (Block C) and Administration Block (Block D) at Nana Abena Market in Techiman

Urban Market Works
View details
Completed 100%

Nana Abena Market Road Junction Improvement Works, Construction Of Fence Wall and Drainage System at Techiman

Urban Market Works
View details
Ongoing 40%

Procurement Of 1No. Compactor Truck, 1No. Skip Loading Truck, 5No. 12M Skip Containers And 500 No. 240 Litre Bins For Solid Waste Collection

Waste Collection Goods
View details
Practically Completed 99%

Surfacing Of Nana Awerempem Street And Construction Of Traffic Signals At Two Major Intersections In Techiman

Urban Road Works
View details
Completed 100%

Upgrade Millennium Park Road Phase 1 (1.60Km) Consisting Of 0.6M U-Drain, 3,500M Of 0.9 Diameter Pipe Culvert (2No), 0.9M U-Drain Outfall (300M), Road Works (2000M) (Sub-Base, Base, Primer And 1St Seal).

Urban Road Works
View details
Completed 100%

Upgrading Of Abanemu Roads (418m) at Techiman

Urban Road Works
View details
Completed 100%

Upgrading Of Agyeiwaa Road to DVLA Office (0.246m) And Link 1 Road (0.154Km) at Techiman

Urban Road Works
View details
Completed 100%

Upgrading Of First Gate To Nbangba - Jusbro Road (1700M) Comprising 0.9M Diameter U-Drain (260M), 0.6M Diameter U-Drain (1560M), 1.2M Diameter U-Drain (100M), Sub-Base (1700M), Base (1700M) Primer Seal (1700M) And Seal (1700M).

Urban Road Works
View details
Completed 100%

Upgrading Of Timber Market Road - Bethel School Link (1530M) Comprising Of 0.45M Diameter U-Drain (1068M), 0.6M Diameter U-Drain (1068M), 0.9M Diameter U-Drain (581M), Sub Base (1530M) Base (1530M), Primer Seal (1530M) And Seal (1530M)

Urban Road Works
View details
Completed 100%

Upgrading Of Ucew Distance Centre (Hansua) To Diasempa Road (2150M) Comprising 0.9M Diameter U-Drain (2850M), 0.6M Diameter U-Drain (1550M), 1.2M Diameter Pipe Culvert, Sub-Base (2150M), Base (2150M), Primer Seal (2150M) And Seal (2150M)

Urban Road Works
View details
Completed 100%

Upgrading Of Yam Market - Mayanka Road (900M) Comprising 0.9M Diameter U-Drain (370M), 0.45M U-Drain, 0.6M Diameter U-Drain (921M), Sub-Base (900M), Base (900M), Primer Seal (900M) And Seal (900M)

Urban Road Works
View details
Practically Completed 99%

Upgrading Saanse Road And Gyaase Loop And Link (850M) - Consisting Of 0.6M U-Drain (1300M), 0.9M U-Drain (400M), 1No 0.9M Pipe Culvert, 1.2M Diameter Culvert, Road Line Markings (2550M), Sub-Base, Base, Primer And First Seal

Urban Road Works
View details