Completed
Urban Road
Works
Bitumen Surfacing Of Dr. Addy, Juduro And O' Right Streets At Nkwantanum
Birim Central Municipal Assembly
Physical Completion
100%Map Location
Other Sub-Projects in Birim Central
Bitumen Surfacing Of Aboabo Mustard (0.495Km), Aboabo Pentecost Street (0.550Km) And Aboabo Methodist Loop (0.225Km)
Completed
Bitumen Surfacing Of Oda Methodist Resident Street (1.700Km)
Completed
Bituminous Surfacing Of Nkwantanum Road With Road Signs And Markings, And Construction Of 260M Of Concrete U-Drains Along The Nkwantanum Road
Completed
Completion Of 34 Lockable Shops (Block A) And Waiting Area (Conference Room, Restaurant, And Offices)
Completed
Completion of Outstanding Works on UDG-1 Project
Completed
Construction Of 275M X 0.9M Concrete U-Drain, 2M X 2M Reinforced Concrete Box Culvert And Installation Of 264M X 1800M Precast Concrete Pipe
Completed
View all sub-projects in Birim Central
Sub-Project Details
Investment Type
Urban Road
Category
Works
Municipal Assembly
Birim Central