Municipal Assembly

Birim Central

11

Sub-Projects

11

Completed

0

Ongoing

100%

Avg. Completion

Completed 100%

Bitumen Surfacing Of Aboabo Mustard (0.495Km), Aboabo Pentecost Street (0.550Km) And Aboabo Methodist Loop (0.225Km)

Urban Road Works
View details
Completed 100%

Bitumen Surfacing Of Dr. Addy, Juduro And O' Right Streets At Nkwantanum

Urban Road Works
View details
Completed 100%

Bitumen Surfacing Of Oda Methodist Resident Street (1.700Km)

Urban Road Works
View details
Completed 100%

Bituminous Surfacing Of Nkwantanum Road With Road Signs And Markings, And Construction Of 260M Of Concrete U-Drains Along The Nkwantanum Road

Urban Road Works
View details
Completed 100%

Completion Of 34 Lockable Shops (Block A) And Waiting Area (Conference Room, Restaurant, And Offices)

Urban Market Works
View details
Completed 100%

Completion of Outstanding Works on UDG-1 Project

Urban Market Works
View details
Completed 100%

Construction Of 275M X 0.9M Concrete U-Drain, 2M X 2M Reinforced Concrete Box Culvert And Installation Of 264M X 1800M Precast Concrete Pipe

Storm Water Drainage Works
View details
Completed 100%

Construction Of 34-Lockable Market Shops (Block B) Paving, U-Drain And Refuse Container Base

Urban Market Works
View details
Completed 100%

Construction Of 34-Lockable Market Shops (Block C) Nursery, Washing Rooms, And Sick Bay

Urban Market Works
View details
Completed 100%

Construction Of 68 Lockable Market Shops And Ancillary Facilities

Urban Market Works
View details
Completed 100%

Precast Blocks Paving Of Old Premier Market (3,000Sq.M) And Construction Of 600Mm Diameter Concrete ‘U’ Drain (240M)

Urban Market Works
View details