Ongoing
Urban Market
Works
Pavement Of 12,000M2 Area Waiting Lounge, Installation Of 30 Security Light, 2No. Bus Terminal
Nkoranza South Municipal Assembly
Physical Completion
80%Map Location
Other Sub-Projects in Nkoranza South
Bitumen Surfacing Of 0.62Km Road With 0.45M U Drain (465M), 0.6 U Drain (233M), 0.9 U Drains (140M), Sub Base (620M), Base (620M), Primer Seal (620M), Seal (620M) At Nkoranza
Ongoing
Construction Of 100-Unit Market Stalls With 12-Seater W/C Toilet And 10 Bathrooms
Completed
Construction Of 100-Unit Stalls And Construction Of 2-Unit Creche With Office
Completed
Construction Of 1No. Police Post, 1No. Health Post And Construction Of 6-Seater Wc Toilet, Drilling And Mechanization Of 2No Boreholes
Completed
Construction Of 2-Storey 50-Unit Comprising 47 Lockable Stores
Completed
Construction Of 2-Storey 50-Unit Lockable Stores At The New Market
Ongoing
View all sub-projects in Nkoranza South
Sub-Project Details
Investment Type
Urban Market
Category
Works
Municipal Assembly
Nkoranza South