Completed
Urban Park
Works
Construction Of 1 No. Restaurant With A Pub And Tv Theatre, 20-Seater Washroom
New Juaben South Municipal Assembly
Physical Completion
100%Map Location
Other Sub-Projects in New Juaben South
Bitumen Surfacing Of 0.7Km Galoway To St. Dominic Roads
Completed
Bitumen Surfacing Of Selected Roads (25M), Construction Of 2.5M Box Culvert And 1200Mm Diameter Pipe Culvert (60M) At Ada
Completed
Channelization By Excavation To Design Cross-Section Of Nsukwao River Channel (407M), Construction Of Pond, Reinforced Concrete Chamber And Laying Of Pipes Near Victory Presby Church At Ada
Completed
Channelization By Excavation To Design Cross-Section Of Nsukwao River Channel Between Ada/Magazine And Centimental. (Nsukwao R.886M, Tributary, 508M), Stone Lining Of Seclected Sectors (238M) And Construction Of 1 No.2,5Mx 1M And 3Mx1 M Box Culvert
Completed
Construction Of 1 No. Public Stand With Stores, Electrical Room And 1 No. Vip Stand.
Completed
Construction Of 1No. Gym And 1No. Health Post At The Koforidua Jackson Park
Completed
View all sub-projects in New Juaben South
Sub-Project Details
Investment Type
Urban Park
Category
Works
Municipal Assembly