Completed Urban Road Works

Bituminous Surfacing Of 1.2Km Ahwiaa-Zongo With 0.9M U-Side Drains On Both Sides, 2.0M Wide Pedestrian Walkway On Both Sides And 2No Culvert At Ahwiaa Zongo & 1.1Km Asenua Prekese – Meduma By Pass Road With 0.9M U-Side Drains On Both Sides, 2.0M Wide Pedestrian Walkway On Both Sides At Meduma, Asennua - Prekese

Kwabre East Municipal Assembly