Municipal Assembly

Mfantseman

10

Sub-Projects

4

Completed

6

Ongoing

92%

Avg. Completion

Ongoing 79%

Construction Of 2-Storey 30No. Lockable Stores With Conference Hall, 48No. Open Stalls (Block ‘A’) And 32No. Open Stalls (Block ‘B’) At Saltpond Market

Urban Market Works
View details
Completed 100%

Construction Of 20No. Lockable Shops, 600M Fence Wall And Installation Of Street Lights At Mankessim Bus Terminal

Transport Terminal Works
View details
Ongoing 83%

Construction Of 2No. 90-Unit Stalls, 5No. 48-Unit Open Sheds, 20-Seater Toilet Facility With 10-Unit Bathrooms And External Works At The Mankessim Integrated Bulk Storage Market

Urban Market Works
View details
Ongoing 84%

Construction Of 40No. Lockable Stores With Restaurant And Conference Block At Mankessim Integrated Bulk Storage Market

Urban Market Works
View details
Completed 100%

Construction Of 60 Lockable Stores At Anomabo

Urban Market Works
View details
Ongoing 90%

Construction Of Double Seal Bituminous Road With Side Drains From Kuntu Junction (Anokyi) To Kuntu Town 3.8Km

Urban Road Works
View details
Practically Completed 98%

Construction Of Two (2) Storey, Thirty-Six (36) No. Lockable Stores At Mankessim

Urban Market Works
View details
Completed 100%

Construction of Bus Terminal, Access Road (Paving Blocks, Retaining Wall, and Excavation by Dredging (Channel Improvement)) at Mankessim

Transport Terminal Works
View details
Completed 100%

Construction of Bus Terminal, Main Building and Paving of the Bus Terminal at Mankessim

Transport Terminal Works
View details
Ongoing 84%

External Construction Works At The Integrated Bulk Market At Mankessim (Site Preparation And Clearance, Access Road, Box Culvert, U-Drain, Electrical Installation And External Water Supply And Distribution)

Urban Market Works
View details